top of page
A digger sits on a gravelled area in front of a large house, surrounded by greenery and fencing.

Groundworks contractors preparing sites in Farnham Common

Tracked mini-diggers. Mechanical compaction. Full health and safety documentation.

A sound base before visible building begins

Levels checked first

We establish formation and drainage requirements before moving the ground.

Compact plant available

Tracked equipment helps us work within tighter residential access routes.

Buried routes coordinated

We position drainage and service trenches before they are covered over.

Start the build on properly prepared ground

Foundations, drainage and service routes disappear from view quickly, but faults below ground tend to return in expensive ways. Our groundworks contractors assess ground conditions, levels, known services and site access before excavation starts. We consider how spoil will leave the site, where machinery can work and how drainage falls affect the layout. Excavation and reduced-level preparation then create the formation for foundations, slabs or external surfaces. Sub-bases are placed and compacted for the intended load, giving the structure above a stable beginning rather than relying on whatever happens to be under the first shovel.

Foundation of a new building under construction next to a house, surrounded by temporary fencing and greenery.
A digger sits on a gravelled area in front of a large house, surrounded by greenery and fencing.

Machinery chosen around the actual site

Tracked mini-diggers help us excavate with control where full-sized machinery would be awkward, while compactors consolidate bases in measured layers. We check gates, working room and ground strength before bringing plant onto the property. Alongside foundations, we can form drainage runs, service trenches, patio bases, paving preparation and landscaping levels where these belong to the same package. Safe digging and controlled plant movement are planned through the job documentation. Once formation levels and buried work have been checked, the next construction stage can proceed with clear information below it.

Frequently asked questions

What checks are needed before excavation?

We review access, levels, ground conditions, drainage and available information about buried services. We also plan machinery movement and spoil removal so excavation can proceed without blocking the rest of the site.

Can you work where access is restricted?

Often, yes. We use tracked mini-diggers and compactors suited to many residential sites, but access width, overhead clearance, turns and ground strength must be checked before equipment is selected or delivered.

Do groundworks include drainage and patio bases?

They can. We can include drainage improvements, service routes, patio sub-bases, paving preparation and landscaping formation where they form part of the agreed package. The quotation will define the exact extent.

Get the ground checked before you dig

Complete our enquiry form with site and access details, or call us to discuss the required groundwork.

A digger sits on a gravelled area in front of a large house, surrounded by greenery and fencing.
bottom of page